Skip to main content

GNWT-INF - MV2023L8-0015

​Replace the existing culvert crossing of the Redknife River with a clear span bridge across the channel.  Assocaited with Land Use Permit MV2023X0039.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
GNWT-INF - Redknife River Bridge - 2024 Annual Water License Report - Apr 17_25.pdf (292.05 KB)